ITER — Saint-Paul-lez-Durance
Evacuation and safety sound system for the site — 42 hectares.
Since 2019, we have been supporting the ITER Organization team in designing the future evacuation and safety sound system for the 42-hectare site.
Some thirty buildings, together with the entire outdoor platform, were modelled taking into account the site's definitive operation, particularly in terms of operating noise, all in order to maximize the intelligibility and coverage of safety messages.
Nearly 1,300 loudspeakers were thus positioned and carefully selected to ensure compliance with the technical, acoustic and industrial constraints and to guarantee the optimal operation of the EN 54 safety sound system.