Back to projects

Assembly hall — Metz

Audiovisual audit and project management for the deliberation chamber.

Category
Institutional
Year
2021
Location
Metz
Studio
Scenarchie Scenic & AV engineering
Assembly hall — Metz — Institutional, Scenarchie

The audiovisual audit and advisory assignment concerned the assembly chamber of the Hôtel du Département of the Moselle. As a base it comprised a survey of the existing installations and advice to the department on the changes and improvements to be made; as an option, the drafting of the contractual documents for the audiovisual contract, technical assistance for the analysis of tenders, the monitoring of the works and the acceptance of the equipment.

The operation covered the replacement of the sound system, of speech control and management, the layout of the control room and the reinforcement of the sound in the deliberation chamber of the general council, by means of a conference system with high-quality digital control and sound transmission. The system can be extended to simultaneous interpretation and electronic voting.

Speech control from a touch screen also drives the peripherals: two video projectors, two screens, the movable partition of the room, the lighting and the recording.

A project, a space to
bring to life?

Let’s discuss your project