Back to projects

Theatre — Colmar

Overhaul of the stage networks and transition of the lighting stock to LED.

Category
Culture
Year
In progress
Location
Haut-Rhin
Studio
Scenarchie Scenic & AV engineering
Theatre — Colmar — Culture, Scenarchie

The theatre wanted to upgrade its stage networks: since the last works campaign, digital technologies have moved on and made part of the installations obsolete. The end of production of halogen lamps for the performing arts is also forcing an accelerated switch of the stage lighting to LED technology.

The operation covered a complete upgrade of the technical infrastructure: thorough refurbishment of the stage networks, full conversion of the lighting stock to LED and complete replacement of the sound system. The aim was to improve the energy performance of the venue while offering a quality of sound and light reproduction that meets today’s standards.

We carried out a comprehensive engineering assignment: audit and full diagnosis of the existing network and audiovisual equipment, design of a new IP stage network for smooth, centralised data management, strategic development of the new LED fixture stock optimising colour rendering and consumption, and complete design of the sound system for optimal acoustic coverage.

2 000
Area m²
600 k€
Equipment (excl. VAT)

A project, a space to
bring to life?

Let’s discuss your project